BRIDGE OPENING SEPT. 23rd!

BRIDGE OPENING

Saturday, September 23rd

4:00 pm

Your Mayor and Council are busy making plans for a very local celebration to recognize the hardship endured and cooperation from all the residents during the Sugarloaf Bridge Replacement.

The first vehicle will go across the bridge at 4:00 pm on Saturday, September 23rd. We have a vision of all the people on the bridge in the pedestrian walkway while a parade of emergency vehicles (that are too heavy to have used the bridge since the fall of 2013) go across the deck. An aerial photo will be taken to mark the occasion. We’ll follow up with cupcakes for all just off the west end of the bridge.

So. . . if you want to be there, you should know. . . walking access will be available from both sides starting at 3:30 pm. First vehicle traffic will be from west to east at 4:00 pm. The vehicles will circle around and drive back across east to west for the completed parade and celebration.

NOTICE: Water Shut-Off September 12th

WHAT: Water will be SHUT OFF, followed by  a BOIL WATER ADVISORY for at least two days.

WHEN: Tuesday, September 12th from 8:00am to 4:00pm

WHY: to complete installation of the permanent waterline across the Sugarloaf Bridge.

WHERE: This will only affect those on the EAST SIDE of the Zeballos River.

See What to do during a Boil Water Advisory for more information.

Check back on the Village website for updates.

Waterline Move

The Village wants to ensure that everyone on the Zeballos Water System is aware of the planned events over the next few days.

It’s time to move the water line from its temporary location to its new permanent location.

STEPS:

  1. PERMANENT WATERLINE IN PLACE AND ACROSS THE BRIDGE with connections at each end
  2. PREASSEMBLE CONNECTIONS prior to water shut off
  3. WATER OFF for up to 8 hours                                                                                  AUGUST 28th
  4. WATER ON with Boil Water Notice
  5. WATERMAIN FLUSHED
  6. FIRST SAMPLES COLLECTED AND SENT FOR TESTING                                        AUGUST 29th
  7. SECOND SAMPLES COLLECTED AND SENT FOR TESTING                                  AUGUST 30th
  8. RESULTS FROM TESTING RECEIVED                                                                       AUGUST 30 & 31st
  9. Boil Water Notice Lifted (EARLIEST)                                                                      AUGUST 31st
  10. RESIDENTS NOTIFIED VIA usual locations*

 

WHO WILL BE WITHOUT WATER:

Everyone to the east of Zeballos River (Maquinna, Pandora, Reno, Ferris) plus Parkway Road east of the Health Clinic.

WHEN: 

Monday, August 28th , 2017 8:00 am to 4:00 pm

HOW LONG WILL WE HAVE TO BOIL WATER:

From the moment the water is back on until approximately noon on Thursday

*Usual Locations are:                 Zeballos.com website, Notice Boards at Village Office, Post Office, Band Office, Rosa Island Store, Zeballos General Store as well as the Zeballos EPC posts on Facebook Zone Social site and Inlet Outpost site.

Posted August 22nd

Blasting work between June 23rd-27th

Please be advised that Surespan Construction will conduct blasting activities between June 23rd and 27th for production of riprap for use on the construction of the new Sugarloaf Bridge.

Specific notice will be published in the usual locations for everyone to access and will also be hand delivered to Keno Crescent residents as they will be closest to blasting.

PLEASE NOTE THE FOLLOWING:

  • While detonating explosives, Zeballos FSR will be CLOSED between Parkway Road and Km 37 for 30-minute intervals.
  • Notice for blasting will be given via a distinctive, audible signal (Horn) with 12 short whistle signals at one second intervals. 2 minutes after the last whistle, the blast will be initiated.
  • Following the blast, the area will be inspected. When found safe, one prolonged whistle signal of at least 5 seconds will sound.

See here for the blasting site and other details: NOTICE_Blasting_June 2017

NOTICE: Water Shut-Off June 21st

The Village wants to ensure that everyone on the Zeballos Water System is aware of the planned events over the next few days.

In order for the Sugarloaf Bridge Replacement to move forward, the waterline must be temporarily moved out of the construction zone. Once the new bridge is completed, the waterline will be replaced.

This notice covers the move to a temporary line

STEPS:

    1. TEMPORARY WATERLINE IN THE RIVER   with connections at each end
    2. PREASSEMBLE CONNECTIONS prior to water shut off
    3. WATER OFF for up to 8 hours
    4. WATER ON with Boil Water Notice
    5. WATERMAIN FLUSHED
    6. FIRST SAMPLES COLLECTED AND SENT FOR TESTING
    7. SECOND SAMPLES COLLECTED AND SENT FOR TESTING
    8. RESULTS FROM TESTING RECEIVED
    9. Boil Water Notice Lifted
    10. RESIDENTS NOTIFIED VIA usual locations*

WHO WILL BE WITHOUT WATER:
Everyone to the east of Zeballos River (Maquinna, Pandora, Reno, Ferris) plus Parkway Road east of the Health Clinic.

WHEN:  
Wednesday, June 21st, 2017 8:00 am to 4:00 pm

HOW LONG WILL WE HAVE TO BOIL WATER:
From the moment the water is back on until approximately noon on Saturday

More specific notice of timing will be broadcast at the usual locations*

 *Usual Locations are: Zeballos.com website, Notice Boards at Village Office, Post Office, Band Office, Rosa Island Store, Zeballos General Store as well as the Zeballos EPC posts on Facebook Zone Social site and Inlet Outpost site.

Water Shut-Off June 21st